PNG LNG Camps

CCJV

Completion Date: December 2013

Port Moresby Electrical provided material supply and installation for a number of camps associated with the PNG LNG Project.

These were located in remote areas and thus the supply of materials of the correct quality and quantity was of the utmost importance. Included in the installation was connection of generating equipment with main control and switchboard, installation of all sub mains and distribution boards and connection to portable accommodation units.

Satellite TV cabling, Data and communication cabling and connection of satellite dishes were also carried out. Final PNG Power certification was arranged by Port Moresby Electrical.

Services Provided:
  • Engineering and design
  • Schedule procurement of materials
  • Installation of all Electrical, data, telecommunications and
  • television services
  • Logistics support for projects